UTM SOLAR HOME ARCHITECTURAL DESIGN TEAM, Jabatan Senibina, Fakulti Alam Bina, UTM.
A. Team:
- Prof Madya Dr Mohd Zin Kandar (Head - Architectural Research Team).
- Ar. Fadli bin Arabi (Research Assistance)
- Ar. Elina bt Mohd Husini (Research Assistance)
- Abdelrahim Shehab (Research Assistance)
- Muhammad Haiqal bin Rosli (Research Assistance)
- Mohd Hidayat b. Azizul (Research Assistance)
- Dodo Yakubu Aminu (Research Assistance)

- T.o.R;
- To produce Schematic Architectural Design & Presentation Drawings.
- To produce working drawing and detail drawing where appropriate.
- To provide specification of architectural building components.
- To produce schematic design of the furniture of the interiors.
- To produce interior design drawings & specifications.
- To produce landscape design for the proposed building.
- To coordinate and monitor construction progress with other design team, QS and contractors.
- To plan & request financial allocation for the preparation of drawings and any related cost.
- To prepare any additional tasks as directed by the project leader in relation to pre and post-completion such as for promotional activities.

C. Architectural Design Concept;
UTM Eco-Home concept will be demonstrating several important sustainable and green concept of building design, construction and operation which will highlight the following components:-
- Design response to climate;
- Considering sun path to reduce direct solar heat gain inside the building.
- Installing heat & sound insulations to minimise heat transfer from outside temperature.
- To provide Large overhang / balcony / Terraces where appropriate.
- Utilisation of maximum daylighting for the interiors.
- Integration of natural ventilation innovative design system to allow ventilation flow and provide appropriate thermal comfort (where appropriate).
- Appropriate landscaping & Green Wall.
- Integration of water element.
- Other EE Design innovations and technologies.

2. Low Carbon Building Material & Construction;
- Selecting building materials that contained less embodied energy (less CO2 content) means avoiding negative impact on environment. Every building material contain embodied energy (GJ/m2 or m3) i.e energy that were consumed for the production, transportations and installation of the building component. Less embodied energy can be achieved by selecting building materials produced locally or recycle-based building products.
- Constructions and installation of the building components with less waste. This can be done by selecting appropriate building material size and design during purchasing.

3. Innovative & EE Electrical Appliances;
- All fixtures (i.e. lighting, AC, etc) should be EE equipment / Energy Star Rating.
- Electrical appliances should be Energy Star Rating.
- Installation of smart indoor control system.
4. Renewable Energy;
- PV installation for energy demand.
- Solar water heating system.
- Rain water harvesting system.
5. Building Certification;
- To achieve GBIM/GreenRE Gold or Platinum rating by integrating appropriate design strategies and material selection.
6. Commercial value & Market appeal;
- Comply with current market demand and competitiveness.
- Integrate innovative furniture design to suite with the overall design objective.
- Appropriate and impressive design (exterior & interior).
Prepared by;
Assoc Prof. Dr Mohd Zin Kandar
12 Feb 2014
RELOCATION OF SITE & DESIGN UPDATES